Register here to join Part 1.
Follow along in this first part of three webinars as we walk through a basic example project in the GEOVIA Surpac Stope Optimizer utility, turning a block model into optimized stopes ready for future mine design and scheduling. The various inputs will be explained as we go and advice provided for how to approach stope creation for the first time using general inputs.